Essays

EssaysPlant notes

When the people who know retire

About one manufacturing worker in four is 55 or older. Their know-how lives in notes and memory. Capture it while the veteran can still check it.

By Published 9 min read

See the Breakdown diagnosis track →

Cover: "When the people who know retire", Lehvel plant notes, with the line "Capture it while they can still check it." Portrait of Jason Murphy, founder of Lehvel.

Picture the last week before a retirement party. The maintenance tech who has kept the saw line running for thirty years walks a younger tech through the shop. At the CNC saw he puts his hand on the guard. "When she starts singing like this, it's the spindle bearing. Don't wait for the PM. Order the bearing the same day."

The younger tech nods. Nobody writes it down. The work order history for that saw says "Checked and ok, returned to service" over and over. The sentence that would have saved a two-day stoppage goes home with him on Friday.

About one manufacturing worker in four is 55 or older. The Bureau of Labor Statistics counts 15,134,000 people employed in manufacturing in 2025. Of those, 2,942,000 were 55 to 64, and 878,000 were 65 or older. That is about one in four by our count. The median manufacturing worker was 43.9 years old. [1]

Plant know-how lives in close-out notes, workarounds and one veteran's memory. The cheapest capture is to make the work orders say what he knows while he is still there to correct them.

Exhibit 1

Age of people employed in manufacturing, 2025

16 to 247.9%25 to 3422.4%35 to 4422.9%45 to 5421.5%55 to 6419.4%65 and over5.8%Orange: 55 and over, about one worker in four.Median age 43.9. Share of 15,134,000 employed.
Source: US Bureau of Labor Statistics, Current Population Survey, Table 18b, 2025 annual averages (11 months; October excluded). Percentages are our arithmetic on the BLS counts.

The hiring side is just as tight

The Manufacturing Institute and Deloitte project that as many as 3.8 million workers could be needed from 2024 to 2033. They say 1.9 million of those jobs could go unfilled without significant change. [2] For technicians alone, the people who fix the machines, they put openings at 2.3 million from 2025 to 2030. That includes jobs retirements leave behind. [3]

Plants worry. Few have a plan.

The most recent publisher-level number we found on knowledge loss is from 2019. The National Association of Manufacturers reported Manufacturing Institute research in which 97% of respondents said they fear losing institutional knowledge when older workers leave. [4] We label it 2019 every time.

A newer survey is regional. In 2025 the NEW Manufacturing Alliance, in Northeast Wisconsin, surveyed 65 companies employing 14,961 people. 75% were concerned about their workforce retiring. Only 37% had a plan to address it. [5] That is one region, not a national count.

Exhibit 2

Worried about retirements, and planning for them

Concerned about their workforce retiring75%Have a plan to address it37%65 companies, 14,961 employees, Northeast Wisconsin
Source: NEW Manufacturing Alliance (Northeast Wisconsin), reported by WisBusiness, May 6, 2025. Regional survey, not national.

75% of manufacturers in one Northeast Wisconsin survey worry about retirements. 37% have a plan.

NEW Manufacturing Alliance, via WisBusiness, 2025

What leaves with the veteran

Go back to the saw. The sentence about the spindle bearing was never in a work order, and the history still says "Checked and ok, returned to service."

Three things leave in that sentence.

  • The real fix. What the tech did, not what the form asked. Which part failed, what it sounded like first, what he ordered, how long it held.
  • The workaround. What second shift knows. Run the oven ten degrees hot on Mondays. Re-zero the press brake after a die change. Never trust the first cut after lunch.
  • The judgment. Which alarm to ignore and which one stops the line.

Siemens' 2024 True Cost of Downtime report is a vendor study of 181 respondents at large industrial firms. It found it now takes 81 minutes on average to get production back up after a stop, up from 49 minutes five years earlier. Siemens names lost maintenance skills as one cause, alongside harder-to-source spare parts. [6] Those are large plants, and the figure is Siemens'. The direction will be familiar to anyone who has watched a new tech take three tries at a restart a veteran did in one.

The work order holds a template, not the answer

The CMMS was supposed to hold this. In our blind test of Claude for Manufacturing, we planted this defect in a synthetic plant. Fourteen of 19 maintenance work orders carried the same close-out: "Checked and ok, returned to service." Only 3 of 7 work orders on the CNC saw had substantive notes. [7]

The plugin's breakdown-diagnosis skill discounted the template notes as evidence and said so. That left it almost nothing except the sensors. The template comes from a required field at the end of a long shift. The tech knows the answer and has no reason to type it. The veteran never needed the record. He was the record.

Exhibit 3

What a close-out should capture, against what it usually says

FieldWhat it usually saysWhat it should say
SymptomSaw downRising whine, then seized; tripped breaker; ran off and restarted twice first
Cause found(blank)Spindle bearing failed; race scored
FixChecked and ok, returned to serviceReplaced spindle bearing from spares; checked alignment
Early warning(no field)Vibration climbed for about a week before the stop
Next time(no field)Order the bearing as soon as the whine starts; do not wait for the PM
Synthetic data. No real plant.
Source: Lehvel, illustrative close-out built from the synthetic plant in our blind run, November 2026. The left column's Fix entry is the template close-out we planted. Every other entry, including the whole right column, is invented to show the fields.

"Early warning" and "next time" are the two fields that carry know-how. Check whether your CMMS template asks for either.

Anthropic's plugin source says what breakdown-diagnosis reads. It reads the sensor window before the failure, the asset's maintenance history with its open-text close-out notes, photos and the manufacturer's troubleshooting tree. It ranks likely causes, each with its evidence, the prior work orders behind it and the cheapest test that tells them apart. It surfaces any safety implication before any diagnosis. Its output is always a draft the technician applies. [8] Every input except the sensors is something a person wrote down. The skill leans on the notes, so the capture job is to make them true.

A 30-day capture plan

The job is not to record the veteran on video. The job is to make the work orders say what he knows, with his signature on each rule.

  1. Week one: pick ten failure modes. Sit with the veteran and the maintenance lead. List the ten failures that cost the most time or happen most often. Pull every work order for those assets.
  2. Week two: rewrite the record. For each failure mode, Claude drafts what the work orders should have said from the history and sensor data. The veteran corrects each draft. Keep both versions.
  3. Week three: write the rules and test them. Turn the corrected notes into plant skills, one per asset family. A plant skill is a short written file Claude reads every time it diagnoses that asset. One example: "On the CNC saw, a rising whine with vibration above the normal band means the spindle bearing. Order the bearing at once." Before a rule goes in, Claude reads the past work orders and sensor files and shows where it held. In our blind run the skill found a sibling saw with the same bearing failure and about two weeks of rising vibration months earlier. [7] The veteran signs every rule.
  4. Week four: change the close-out. Replace the open-text box with a structured note. After a repair, the tech says in a sentence or two what he did, out loud or typed. Claude drafts failure mode, part, symptom, fix and what to watch next time. The tech corrects it, so he edits a draft instead of facing a blank field. The maintenance lead reviews a sample each week.

At the end, ten failure modes live in the system with the veteran's signature on them. The next ten take less time, because the method exists.

A plant skill does not replace training hours. The Manufacturing Institute estimates new employees receive 47.6 hours of training on average, and existing employees 26.7. [9] The skill means the new tech's first breakdown comes with the old tech's notes attached. Start with the person closest to retirement, because the plan is urgent for him.

You need work orders with their close-out text, the asset list, and sensor or historian exports if you have them. Start on exports. A CMMS connector comes later, read-only, through a custom connector, because the plugin has no native CMMS connector. [8] The maintenance lead owns the rules after the veteran leaves.

Retention gains too. The Manufacturing Institute and Deloitte found employees 2.7 times less likely to leave in the next 12 months. The condition is that they feel they can build skills that matter for the future. [2] A tech who helps write the plant's rules is building that.

To test it, wait six months after the veteran leaves. Pull every work order on the machines he knew. Count the ones where the tech found the cause on the first visit. If the count holds, the rules carried the know-how. If it drops, find the rule that failed and ask the floor what it should have said. Then put a quarterly review of the plant skills on the maintenance lead's calendar, and ask of each rule whether a repair this quarter contradicted it. If so, the tech who did the repair rewrites the rule and the lead signs it. That makes the veteran's rules the plant's rules, not a memorial to one man's last month. The younger tech from the first paragraph should write the next version.

What Claude cannot capture

Claude does not hear a bearing sing. It does not smell a motor running hot or feel a gearbox through a hand on the guard. Some of that judgment leaves with the veteran no matter what anyone writes down.

Claude can hold the words for what those senses meant. It can tie them to the sensor readings that went with them. It can put them in front of the next person at the right moment. That is less than the veteran. It is a lot more than "checked and ok".

Pull the work orders for your five worst machines and count how many close-outs say something like "checked and ok". Other limits. The 97% figure is from 2019, and we cite it because we found nothing newer at that level. The Siemens figure describes large plants. No credible figure exists for how long a new manufacturing hire takes to reach full proficiency, so we cite none. The close-out and sibling-saw findings come from one synthetic plant we designed, graded by one person. Lehvel is independent. We are not an Anthropic or Infor partner.

Notes and sources

  1. US Bureau of Labor Statistics, "Employed persons by detailed industry and age," Current Population Survey, Table 18b, 2025 annual averages (11-month average; October excluded). Our arithmetic: 3,820,000 of 15,134,000 aged 55 and over, 25.2%. https://www.bls.gov/cps/cpsaat18b.htm
  2. The Manufacturing Institute and Deloitte, "Manufacturers need as many as 3.8 million new employees by 2033," April 3, 2024. https://www.themanufacturinginstitute.org/manufacturers-need-as-many-as-3-8-million-new-employees-by-2033/
  3. Deloitte and The Manufacturing Institute, "The skilled manufacturing workforce and AI," Deloitte Insights, September 2026. Technician and adjacent-industry technician occupations. https://www.deloitte.com/us/en/insights/industry/manufacturing-industrial-products/ai-skilled-manufacturing-technician-workforce-challenges.html
  4. National Association of Manufacturers, "New report dives into retaining the aging manufacturing workforce," July 31, 2019, reporting Manufacturing Institute research. https://nam.org/new-report-dives-into-retaining-the-aging-manufacturing-workforce/
  5. NEW Manufacturing Alliance, 2025 aging workforce study (Northeast Wisconsin), reported by WisBusiness, May 6, 2025. 65 companies, 14,961 employees. https://www.wisbusiness.com/?p=1506565
  6. Siemens (Senseye), "The True Cost of Downtime 2024," 2024. 181 respondents at large industrial organizations. Siemens sells predictive-maintenance software. https://assets.new.siemens.com/siemens/assets/api/uuid:1b43afb5-2d07-47f7-9eb7-893fe7d0bc59/TCOD-2024_original.pdf
  7. Lehvel, "Blind score: Claude for Manufacturing skills, as shipped, on a synthetic plant," graded November 17, 2026. Synthetic data, one grader, plugin pinned at commit fd30cee3. Public summary: https://lehvel.com/essays/we-ran-claude-for-manufacturing-blind
  8. Anthropic, claude-for-manufacturing plugin source, breakdown-diagnosis skill, Apache-2.0, November 2026. https://github.com/anthropics/claude-plugins-official/tree/main/plugins/claude-for-manufacturing
  9. National Association of Manufacturers and The Manufacturing Institute, "Manufacturers invest billions in workforce training," April 15, 2026. https://nam.org/manufacturers-invest-billions-in-workforce-training/

Get Upstream

One note a week: one job we took off an owner's plate, and what came of it.

Posts by Jason Murphy reach 17,000+ followers across our channels. The weekly email is called Upstream.

Weekly. Unsubscribe anytime. Privacy

Talk to Lehvel about your plant.

Forty minutes about your systems and which skills would run first. Pick a time below.

You'll talk with Jason Murphy, founder.He takes the first call and leads every engagement.Bring your IT lead.

  • About 40 minutes
  • Phone or video

Times in Eastern (ET).

Choose a day and time

Checking the calendar.

We use your details to coordinate this call. No payment information is needed.

Rather call or text?Call 888-846-7772Text us

Check your plant's systems against the 17 skills.

Book the Diagnostic, $2,250, credited to the Rollout when you're ready.

BackAll of Essays