Tracks / T20 / Cross-cutting
Model Hardware Standard readiness
Claude for Manufacturing does not run machines. This track writes down your equipment, protocols and safety limits, and sends machine data read-only to the morning report.
Check your systems against the 17 skills
| Who uses it | Plant manager and controls engineer |
|---|---|
| The problem | Every machine speaks a different protocol. The shift lead still walks the floor to find out what needs them first. |
| What comes out | An equipment inventory, one row per machine, with its protocol, its safety limits and their owner. Machine data reaches the morning report read-only. |
| Day one, exports only | No. Nothing runs on equipment. Day one is the readiness work: an equipment and protocol inventory, and the read-only data path the morning report already uses. |
| With a connector | Applications to the preview go through modelhardwarestandard.com. Anthropic says the preview wants plants ready within one to two months. |
| Who signs | Controls engineer and safety owner, every limit |
What it is.
- The Model Hardware Standard is Anthropic's research preview. It is not part of Claude for Manufacturing, and Claude for Manufacturing does not operate equipment.
- Anthropic describes an open, model-agnostic standard, co-developed with HHMI Janelia. It gives programmable equipment a standard way to describe its measurements, settings and safety limits.
- Anthropic says it is one interface over existing protocols such as OPC UA.
- Anthropic says a driver layer enforces interlocks, e-stops and low-latency control, and blocks out-of-bounds actions. The model writes code that runs at hardware speed and stays in the loop for error recovery.
Not a single plugin skill. Statements by Anthropic and Infor are attributed below. Plugin source.
A worked example.
A 60-person plant asks whether Claude will run its machines.
- On August 27, 2026, Anthropic announced a shared specification for agents to safely operate physical devices.
- It is a research preview, open by application. A 60-person plant cannot buy it off the shelf.
- What goes in: ten checks. Each machine's protocol, where every e-stop lives, and who the controls engineer is.
- What comes out: one sheet. Each machine, its protocol, who owns its controls, and what it would need.
- The read takes a few days and needs no hardware.
- Check 06 is one name for every machine. It also helps the maintenance and production skills today.
- Where a person signs: the controls engineer owns the limits. Lehvel has no MHS access or deployment.
Source: Plant note: Claude on the machine?.
What goes in.
- An equipment list: make, model, controller and protocol
- Documented safety limits and interlocks per machine
- Where machine data lands today: historian, MES or nowhere
What comes out.
Our blind run did not reach this skill. This is the output its SKILL.md describes. No example is invented.
One row per machine: asset tag, make and model, controller, protocol, data destination. The documented safety limits and interlocks for each, with the person who owns them. Which machines could join a pilot first, and why.
The first week.
- We list every machine: asset tag, make, model, controller and protocol.
- Your controls engineer and safety owner write down the limits and interlocks, machine by machine.
- We connect the machines that already export data to the morning report, read-only.
What it does not do.
- It does not write to equipment.
- Lehvel does not deploy the standard and has no access to the preview.
What Lehvel adds.
The plugin leaves this part to you. We do it.
- We inventory your equipment, controllers and protocols, and mark which already speak OPC UA.
- We write down safety limits and interlocks with your controls engineer and safety owner, machine by machine.
- We connect machine data read-only to the morning report, which uses it now, whatever Anthropic ships next.
Every statement about the standard is Anthropic's. Lehvel does not deploy it and claims no access to the preview.
Who signs.
Claude drafts. A named person decides.
| Who | Where | What it protects |
|---|---|---|
| Controls engineer and safety owner | Every limit | Own the safety limits. Nothing in this track writes to equipment. |
What Anthropic and Infor have said.
Anthropic's vision: a shift lead asks "What needs me first?" Its patterns are automated R&D on physical processes, scaling without babysitting, and augmenting operators.
Anthropic is developing the Model Hardware Standard, a research preview that gives programmable equipment a standard way to describe its measurements, settings, and safety limits.
Three questions the Diagnostic asks.
- How many machines run on a PLC or controller you could read today, and over which protocol?
- Are each machine's safety limits written down, and who owns them?
- Where does machine data land now, if anywhere?
Pick the tracks that pay first.
The Diagnostic maps your systems to the 17 skills and picks the two or three tracks to run first. The fee is credited in full to the Rollout.
You'll talk with Jason Murphy, founder.He takes the first call and leads every engagement.Bring your IT lead.
- About 40 minutes
- Phone or video
Rather call or text?Call 888-846-7772Text us
Check your systems against the 17 skills
Lehvel is an independent firm. We are not an Anthropic partner, and Anthropic has not certified us. Claude is a product of Anthropic. Anthropic's post · plugin source