Claude for Manufacturing / 17 skills and 3 cross-cutting jobs
Every job Claude for Manufacturing does, one page each.
The plugin's 17 skills, plus three jobs that cross them, grouped by the work: quoting, quality, maintenance and more. Each page says who uses it, what data it needs and who signs off.
Start with a 40-minute call. The call costs nothing. Then the Diagnostic: $2,250, fixed, credited to the Rollout.
Where to start: three jobs that run on day one.
- RFQ to quote
- Runs on day one from the RFQ and your ERP exports: cost history, routings, closed-job actuals. The estimator owns every gate.
- Inspection to CAPA
- Runs on day one from inspection results and the NCR log. In our synthetic run it traced 20 failed inspections to one supplier lot.
- Breakdown diagnosis
- Runs on day one from the maintenance history, with no sensor data needed. It ranks likely causes and puts safety first.
Quoting.
From the RFQ in the inbox to a quote the estimator releases.
| The job | What you will learn | Who uses it | Runs on day one from exports |
|---|---|---|---|
| Customer inquiry intake | Any RFQ, in any shape, read into one intake form. Every field cites the file and page it came from. | Estimator | Yes |
| Quote build | A make-to-order quote with every number traced to its source. | Estimator | Yes |
| RFQ to quote | The whole chain from RFQ to released quote. Four gates, and the estimator owns all four. | Estimator | Yes |
Engineering.
Design variants in Fusion and the trade study that picks one.
| The job | What you will learn | Who uses it | Runs on day one from exports |
|---|---|---|---|
| Design space exploration | A batch of CAD variants in Autodesk Fusion, built from the engineer's own model. | Design engineer | No |
| Trade study report | A scored comparison and a decision memo, with a sensitivity check on every run. | Design engineer | Yes |
Maintenance.
A machine goes down. The likely cause, and the cheapest test.
| The job | What you will learn | Who uses it | Runs on day one from exports |
|---|---|---|---|
| Breakdown diagnosis | Likely causes, ranked with evidence and the cheapest test. Safety comes first. | Maintenance lead | Yes |
| Breakdown to next report | From a machine going down to its cause in tomorrow's production report. | Maintenance lead and plant manager | Yes |
Production.
The morning numbers, waiting before anyone asks.
| The job | What you will learn | Who uses it | Runs on day one from exports |
|---|---|---|---|
| Daily production report | Output against plan, OEE in three parts, downtime ranked two ways, losses in dollars. | Plant manager | Yes |
| Morning plant pulse | The overnight run. The morning report waits at shift start, and the run is safe to leave unattended. | Plant manager and shift lead | Yes |
Quality.
The NCR, the root cause and the 8D, cited to the requirement.
| The job | What you will learn | Who uses it | Runs on day one from exports |
|---|---|---|---|
| NCR write-up | The nonconformance report (NCR), cited to the requirement it violates, with every suspect part located. | Quality engineer | Yes |
| Root cause and CAPA | Ranked causal chains on one verified timeline, each with the test that would confirm or kill it. | Quality engineer | Yes |
| Inspection to CAPA | The quality chain end to end: NCR, history, root cause, 8D and a redacted customer pack. | Quality manager | Yes |
Purchasing.
Supplier RFQs that come back comparable, and an alternate when one fails.
| The job | What you will learn | Who uses it | Runs on day one from exports |
|---|---|---|---|
| Supplier quote request | An RFQ package for suppliers. Every bid comes back in one format, so the bids compare line for line. | Buyer | Yes |
| Supplier escape to alternate source | From a defect traced to purchased material, through root cause, to an RFQ for an alternate source. | Buyer and quality engineer | Yes |
Setup and data.
What every other skill runs on: setup, connectors and one joined dataset.
| The job | What you will learn | Who uses it | Runs on day one from exports |
|---|---|---|---|
| Onboarding | "Set us up": which of your systems Claude can reach, and which skills are limited until it can. | Plant manager and IT lead | Yes |
| Custom connector | A seven-rung ladder for any system with no connector. It stops at the highest rung that works. | IT lead | Yes |
| Data consolidation | One consolidated dataset from ERP, CMMS, MES and quality exports, with every mismatch classified. | Plant manager and IT lead | Yes |
Cross-cutting.
Work that crosses systems and skills: rush orders, niche software, the machines themselves.
| The job | What you will learn | Who uses it | Runs on day one from exports |
|---|---|---|---|
| At-risk and rush orders | An order at risk: stock by warehouse, an approved alternate, a transfer or an added shift. The planner approves each move. | Planner and customer service rep | Yes |
| Niche software integration | Claude connected to QuickBooks and the niche quoting tool your trade runs on. | Owner and estimator at a smaller manufacturer | Yes |
| Model Hardware Standard readiness | Claude for Manufacturing does not run machines. This track writes down your equipment, protocols and safety limits, and sends machine data read-only to the morning report. | Plant manager and controls engineer | No |
The Diagnostic picks your first tracks.
We map your systems to the 17 skills and name which run on day one and which need a connector. Then we pick the two or three tracks to run first. The fee is credited in full to the Rollout.
You'll talk with Jason Murphy, founder.He takes the first call and leads every engagement.Bring your IT lead.
- About 40 minutes
- Phone or video
Rather call or text?Call 888-846-7772Text us
Check your systems against the 17 skills
Lehvel is an independent firm. We are not an Anthropic partner, and Anthropic has not certified us. Claude is a product of Anthropic. Anthropic's post · plugin source