A 2020 vendor survey says 67% of part buyers expect a quote in under 24 hours. The estimator's days go to lookups, not math. Where the hours go and where the quoting skills stop.

By Published 6 min read

See the RFQ to quote track →

Cover: "The quote that takes five days is losing to the one that takes one", a Lehvel plant note, with the line "The math takes minutes. The lookups take days." Portrait of Jason Murphy, founder of Lehvel.

Tuesday, 7:40 a.m. An RFQ lands: fourteen lines, two drawings, and a forwarded thread with the real delivery date four messages down. The math takes ten minutes. The day goes to questions. Which rev is the drawing? The PDF says B. The second email says C, and C was never released. What did we pay for 6061 bar last time, and on which PO? Is the routing in the ERP the one the floor runs, or the one a planner entered in 2019? Can we hold .005 on that bore, or have we only ever shown .015? Is the saw cell booked through the 20th? Some answers live in one person's head. The quote goes out the following Monday. By then the buyer has a price from the shop down the road.

In a 2020 vendor survey, 67% of part buyers said they expect a quote in under 24 hours, up from 53% in 2019. [1] The math is not why a quote takes days.

Exhibit 1

What part buyers say about quotes

Expect a quote in under 24 hours (2020)67%
Say response speed directly affects who they work with (2022)47%
Tried at least one new vendor in the last 12 months (2022)94%

Source: Paperless Parts, 2020 Part Buyer Survey, reported June 2022; Paperless Parts, 2022 Custom Part Buyer Survey, 600+ US respondents, December 2022. Vendor surveys. Notes 1 and 2.

Both surveys are from one quoting-software vendor, Paperless Parts. They are vendor surveys, and the 2020 figure is old. We found no independent study of quote speed against win rate. In its 2022 survey of 600+ US manufacturing professionals, 47% said response speed directly affects whom they work with, and 94% said they had tried at least one new vendor in the last 12 months. [2] Almost every buyer tried a new shop last year.

In 2020, 67% of part buyers said they expect a quote in under 24 hours.

Paperless Parts, 2020 Part Buyer Survey, vendor survey

The estimator's days go to lookups

Every RFQ sends one person through the same chain, in the same order. The estimator asks: which rev, can we build it, what did material cost, how many hours, when can we ship, what do we charge. Each answer lives somewhere different. Some live in one head.

Hiring a second estimator doubles the people doing lookups. It does not shorten the chain. A machinist on a CNC forum described three people sharing quotes in a ten-machinist shop and still missing targets. [6] The Manufacturing Institute and Deloitte project that 1.9 million manufacturing jobs could go unfilled by 2033 if nothing changes. [7] A new hire also lacks what the senior estimator took years to learn: which routing is stale, and that the plant never held .005 on that bore.

What the quoting skills do at each step

Anthropic released Claude for Manufacturing on November 12, 2026: 17 skills and four connectors. [9] Three skills cover quoting. We read their source line by line. [5] Lehvel is independent. Claude for Manufacturing is Anthropic's product, and Anthropic has not published a measured time saving for it. We have not timed a real plant's quotes before and after.

Exhibit 2

Where a quote's hours go: the lookup chain

StepThe questionWhere the answer livesWhat the quoting skills do
01What exactly did they ask for?Email, portal export, PDF, a photo of a marked-up printPulls part, rev, quantity, material and date into one form. Every field names its file and page.
02Which rev is real?The drawing, the email thread, the drawing libraryFlags a conflict instead of picking one.
03Can we build it?Demonstrated capability, often in a headChecks the job against plant limits and names the constraint that fails.
04What did material cost us?ERP purchase ordersPrices material at what was paid on a named PO, not a standard cost.
05How many hours?Routing, closed-job actuals, the modelLabels where each hour came from. Flags actuals that look like booked standards.
06When can we ship?Shop load, the scheduleChecks the date against real load before committing to one.
07What do we charge?Markup rules, last price, the ownerShows margin on its own line. A person releases the quote.

Source: Lehvel's step map, built from Anthropic's claude-for-manufacturing plugin README and the rfq-to-quote, customer-inquiry-intake and quote-build skill files, November 2026. Note 5.

Where the skills stop is in the table. Three stops matter most.

Intake. The customer-inquiry-intake skill puts every field on one form with its file and page. It checks the job against plant limits, names the constraint that fails, and recommends bid or no-bid. It never decides.

Pricing. The quote-build skill prices material at the paid PO and shows setup at every quantity break. Margin sits on its own line. Hours and their basis stay on the internal sheet. Written specs with no drawing produce a budgetary estimate, never a firm quote.

Release. The rfq-to-quote skill chains the two and stops at four gates. The estimator sends the questions, confirms bid or no-bid and the design, then releases the quote. Nothing reaches a customer before the last gate.

The run: it stopped on the .005 bore

We ran the skills blind on a synthetic plant. A separate runner followed the skill files literally and never saw the answer key. [10] One RFQ was built to tempt a fast answer.

Exhibit 3

The quote that stopped itself

Synthetic data. No real plant.

Planted problemWhat the RFQ saidWhat the plant could showWhat the skill did
Tolerance tighter than capability.005±.015, one unconfirmed spec noteProvisional no-bid. Questions drafted for the estimator.
Revision conflictRev B in one email, rev C in anotherRev C unreleasedFlagged. No quote on an unreleased rev.
Missing costPart EX-2250 with a blank costNo cost on fileHeld unpriced. A blank was never read as zero.

Source: Lehvel blind run of Claude for Manufacturing, plugin pinned at commit fd30cee3, graded November 17, 2026 (planted problems D05, D12, D13). Synthetic data, one grader. Note 10.

The runner drafted no price, hours or lead time for that job. It wrote questions for the estimator. On the .005 bore, that stop is the whole value. A fast wrong quote on a part you cannot hold is worse than a slow one.

This is one synthetic plant, designed by us and scored by one grader. It shows what the skills do on planted problems. It does not show what they do on your RFQs. The skill had a ±.015 figure only because one spec note in the synthetic plant stated it, and the runner marked that figure unconfirmed.

Three things the plant writes down first

Capability limits. The tolerances you have held, by machine and material, as numbers with a date. Without them the intake skill cannot make the no-bid call.

Markup rules. How you price a rush or a repeat order. They live in the owner's head. The skill shows margin. It cannot know yours.

Part identity. One part often carries a customer number, your number and a supplier number. In our blind run this was the one weak spot. The skills flagged mismatches and did not resolve them. [10] A person owns the crosswalk.

None of this needs a connector on day one. Per the plugin README, eleven of its twelve atomic skills run from scheduled exports, a folder of CSVs. [5]

Start with the no-bid call

If we started at your shop on Monday, we would start with the no-bid, not the price. The no-bid call needs the least data: the RFQ, the drawing and your written capability limits. It needs no connector. Every job you drop early costs nothing more. It also builds the habit the rest depends on: the machine drafts, the estimator decides, and the decision is written down.

Then the price. Then the ERP connector, so material and routing come in fresh. Then the design step, if you run Fusion.

The math to run on your own shop

We will not hand you a benchmark. One vendor's case study is not your shop. Pull last quarter's RFQ log and fill in this worksheet.

  1. RFQs per week: count them.
  2. Hours per RFQ, inbox to sent. Count calendar days too.
  3. Share of those hours spent on lookups, not arithmetic. Mark each step of Exhibit 2 that waited on an answer.
  4. No-bids, and how late in the process you decided each one.
  5. Losses, and how many went to a shop that answered first.

Hours a week times the lookup share (line 3) is the time on the table. Late no-bids are the cheapest win. Start there: the no-bid call needs only the RFQ, the drawing and your written capability limits.

Notes and sources

  1. Paperless Parts, "The 7 Fatal Mistakes of Quoting #3: Responding Too Slowly," blog, June 9, 2022, reporting its 2020 Part Buyer Survey. Vendor survey; sample not shown. https://www.paperlessparts.com/blog/the-7-fatal-mistakes-of-quoting-3-responding-too-slowly/
  2. Paperless Parts, "Industrial Buyer Survey Reveals New Implications for U.S. Manufacturers," press release, December 19, 2022. Vendor survey of 600+ US manufacturing professionals. https://www.paperlessparts.com/press/industrial-buyer-survey-reveals-new-implications-for-us-manufacturers-throughout-the-supply-chain/
  3. r/ERP, public thread by a builder of quoting tools for distributors, September 3, 2026. https://www.reddit.com/r/ERP/comments/1w66bqa/i_built_ai_quoting_for_a_distributors_asking_if/
  4. Modern Machine Shop, "When It Comes to RFQ, Response Time Is Money," citing Paperless Parts research. Undated; read November 17, 2026. https://mmsonline.com/articles/when-it-comes-to-rfq-response-time-is-money
  5. Anthropic, claude-for-manufacturing plugin README and the rfq-to-quote, customer-inquiry-intake and quote-build skill files, v1.0.0, November 2026, Apache-2.0. https://github.com/anthropics/claude-plugins-official/tree/main/plugins/claude-for-manufacturing
  6. r/CNC, public thread on automated quoting, August 27, 2026. https://www.reddit.com/r/CNC/comments/1vznqot/hows_your_experience_with_automated_quoting/
  7. The Manufacturing Institute and Deloitte, "Manufacturers Need as Many as 3.8 Million New Employees by 2033," April 3, 2024. A projection that assumes no significant change. https://www.themanufacturinginstitute.org/manufacturers-need-as-many-as-3-8-million-new-employees-by-2033/
  8. National Association of Manufacturers, Manufacturers' Outlook Survey, Third Quarter 2026, September 14, 2026. About 220 responses, multi-select. https://nam.org/wp-content/uploads/2026/09/Q3_2026_Writeup_Final.pdf
  9. Anthropic, "Claude for Manufacturing," launch article, November 12, 2026. https://claude.com/resources/articles/claude-for-manufacturing
  10. Lehvel, "We ran Claude for Manufacturing blind on a plant," November 17, 2026. Synthetic data; plugin pinned at commit fd30cee3; one grader. https://lehvel.com/essays/we-ran-claude-for-manufacturing-blind
  11. Paperless Parts, Pindel Global Precision case study. Undated. One vendor-chosen shop; not a benchmark. https://www.paperlessparts.com/case-studies/pindel-global-precision-doubles-its-number-of-annual-quotes-increases-win-rate-by-30-with-paperless-parts/

Get Upstream

One note a week: one job we took off an owner's plate, and what came of it.

Posts by Jason Murphy reach 17,000+ followers across our channels. The weekly email is called Upstream.

Weekly. Unsubscribe anytime. Privacy

Talk to Lehvel about your plant.

Forty minutes about your systems and which skills would run first. Pick a time below.

You'll talk with Jason Murphy, founder.He takes the first call and leads every engagement.Bring your IT lead.

  • About 40 minutes
  • Phone or video

Times in Eastern (ET).

Choose a day and time

Checking the calendar.

We use your details to coordinate this call. No payment information is needed.

Rather call or text?Call 888-846-7772Text us

Check your plant's systems against the 17 skills.

Book the Diagnostic, $2,250, credited to the Rollout when you're ready.

BackAll of Essays