Tracks / T03 / Quoting / rfq-to-quote
RFQ to quote
The whole chain from RFQ to released quote. Four gates, and the estimator owns all four.
Check your systems against the 17 skills
| Who uses it | Estimator |
|---|---|
| The problem | Half my week is chasing missing specs. By the time I have a number, the customer has gone to a faster shop. |
| What comes out | The questions to send and a provisional bid/no-bid first. After the gates, a drafted quote with its cost basis. |
| Day one, exports only | Yes. Runs on a pasted RFQ and file exports. No connector. Every missing piece is labeled. Without Autodesk Fusion, the chain completes from a feature list the estimator types in and confirms. |
| With a connector | Microsoft 365 and NetSuite or Infor M3 where connected. Autodesk Fusion, desktop and open, for the design step and hours from CAM. |
| Who signs | Estimator, at Gate 1, step 4 and at Gate 2, step 5 and at Gate 3, step 8 and at Gate 4, step 11 |
The job.
- Runs the chain end to end. Reads the RFQ and its drawings and checks them against what the plant can build.
- Drafts the questions back and returns a provisional bid/no-bid. Then pulls cost history, routings and closed-job actuals.
- Where Autodesk Fusion is connected, builds an internal estimating model. Derives machine hours per operation and labels the basis of each hour.
- Drafts the quote with its cost basis shown.
- Pauses at four gates, for days if the customer is slow to answer. A late answer re-enters the same chain instead of starting a new one.
From the skill's own SKILL.md, rfq-to-quote, in Anthropic's public plugin source.
A worked example.
The chain stopped on a .005 bore, and four gates kept every send with the estimator.
- Tuesday, 7:40 a.m. An RFQ lands. By hand, the quote leaves next Monday, after the buyer has another price.
- The chain runs intake, then pricing, and stops at four gates. The estimator owns all four.
- Gate 1: the estimator sends the questions. Gate 2: the estimator confirms bid or no-bid.
- In our synthetic run it stopped at a .005 bore. The plant had shown ±.015, from one unconfirmed note.
- What comes out first: the questions to send and a provisional no-bid. It drafted no price, hours or lead time.
- A fast wrong quote on a part you cannot hold is worse than a slow one.
- Gate 3 confirms the design. Gate 4 releases the quote. Nothing reaches a customer before the last gate.
- Lehvel has not timed a real plant's quotes. Anthropic has published no measured time saving.
Source: Essay: The quote that takes five days is losing to the one that takes one. Figures marked synthetic come from a plant we invented.
What goes in.
- The RFQ and its drawings
- ERP exports: cost history, routings, closed-job actuals
- Autodesk Fusion desktop for the design step, where you have it
What comes out: a run on a synthetic plant.
Real output from our blind run. A separate agent ran the skill as shipped on exports from a plant we invented. No real plant, no real customer. Excerpt, verbatim.
Status line: Paused after step 5, at Gate 1 and Gate 2 - the questions are drafted for you to send, and the bid/no-bid is provisional until you confirm it. No quote, price, hours or lead time were drafted. ## Provisional recommendation: NO_BID (line 1; overall no_bid), for the estimator to confirm or override Reasoning: (1) requested +/- .005 mullion cut is outside the demonstrated +/-0.015 in (inferred, unconfirmed capability) Gates: Gate 1 (send questions): pending. Gate 2 (confirm bid/no-bid): pending.
The first week.
- Run the chain on a week of real RFQs, from exports.
- The estimator works each gate as the chain reaches it.
- We time each RFQ from inbox to release. That is the baseline we measure the chain against.
What it does not do.
- It does not send a question or a quote. The estimator sends both.
- It does not let the generated model reach a customer.
- It does not average conflicting quantities. It lists both and asks.
What Lehvel adds.
The plugin leaves this part to you. We do it.
- We set up the plant profile, so the manufacturability check has something real to check against.
- We connect the ERP or estimating system you run when it is not NetSuite or Infor M3.
- We measure the chain on your own RFQs: time from inbox to release, before and after.
Who signs.
Claude drafts. A named person decides.
| Who | Where | What it protects |
|---|---|---|
| Estimator | Gate 1, step 4 | Sends the questions. No mail leaves on anyone's behalf. |
| Estimator | Gate 2, step 5 | Confirms bid or no-bid. |
| Estimator | Gate 3, step 8 | Confirms the model, the tolerance reading, the datum assumptions and the operation list. |
| Estimator | Gate 4, step 11 | Releases the quote. The generated model never reaches a customer. |
What Anthropic and Infor have said.
In its webinar, Anthropic showed this chain pulling part, revision, quantity, material and delivery date from the RFQ. It flagged gaps that could change the price and left the expert to decide which stay open.
Three questions the Diagnostic asks.
- How many RFQs a week, and how many get a quote back?
- Which systems hold the cost history an estimator needs, and who can export it?
- Do you run Autodesk Fusion, or another CAD system, at the quote desk?
Pick the tracks that pay first.
The Diagnostic maps your systems to the 17 skills and picks the two or three tracks to run first. The fee is credited in full to the Rollout.
You'll talk with Jason Murphy, founder.He takes the first call and leads every engagement.Bring your IT lead.
- About 40 minutes
- Phone or video
Rather call or text?Call 888-846-7772Text us
Check your systems against the 17 skills
Lehvel is an independent firm. We are not an Anthropic partner, and Anthropic has not certified us. Claude is a product of Anthropic. Anthropic's post · plugin source