The ERP nobody trusts: the project finished, the data drifted

ERP projects now mostly land near plan. Trust breaks after go-live. In our synthetic plant, 135 of 420 job-cost rows carried the standard, not the actual.

By Published 9 min read

See the Data consolidation track →

Cover: "The ERP nobody trusts", Lehvel plant notes, with the line "Three queries tell you if the actuals are real." Portrait of Jason Murphy, founder of Lehvel.

Picture Monday at nine. The controller opens the margin report by part. Next to it sits a spreadsheet the production manager keeps on a shared drive. The two disagree on the same job by a few hundred dollars. Nobody argues about which one is right. Everyone in the room uses the spreadsheet.

The ERP went live years ago. It runs payroll, purchasing and invoicing without trouble. On what a job really cost, what is on the shelf and which machine stopped, people check it against something else first.

The common story says ERP projects fail. The 2025 numbers say otherwise. The project mostly lands near plan. Trust breaks afterward, when the record drifts from the floor.

In a synthetic plant we built, 135 of 420 job-cost rows carried the standard, not the actual. [5] Every margin report built on those rows said the job went to plan. Five defects make a report quietly wrong. The first is the one behind those 135 rows. A model that reads your records will read the drift in them too.

ERP projects now mostly land near plan

Panorama Consulting's 2025 ERP Report surveyed 172 organizations. More than half stayed within their expected budget. The median project cost $450,000. More than three-quarters finished on time, with a median of 9 months. [1]

Scope matters. Panorama is a consultancy surveying its own audience, and its median respondent had $400.5 million in revenue. The direction still holds: the project is no longer where most of the pain sits.

Exhibit 1

ERP projects, the common story against the 2025 numbers

MeasureThe common storyPanorama 2025
BudgetBlownMore than half stayed within budget
ScheduleLateMore than three-quarters finished on time
Median costn/a$450,000
Median timelinen/a9 months
Top reason for running laten/aData issues: integrity, consistency, accuracy
Source: Panorama Consulting Group, The 2025 ERP Report, 2025. Consultancy survey, 172 respondents, median revenue $400.5 million. The "common story" column is what plants often say, not a survey.

Look at the last row. Among projects that ran late, the top reason was data issues: integrity, consistency and accuracy. A year earlier it was resource constraints. [1] Panorama gives a ranking there, not a share.

After go-live, the floor outruns the record

Every day the floor books labor, scraps parts and receives lots with new numbers on the label. Each one is a small write into a record that was clean on cutover day. Some go in wrong. Some land in the shop-floor or maintenance system and never reach the ERP. They also change routings and swap suppliers. Over a year the record drifts from the floor.

LeanDNA sells software that sits on top of the ERP. It commissioned Wakefield Research to survey 150 senior leaders at discrete manufacturers with at least $250 million in revenue. 93% reported difficulty getting ERP visibility into actual manufacturing execution outcomes. [2] In the same study, 21% strongly agreed and 51% somewhat agreed that their ERP can describe the materials plan but is powerless to prevent execution failures. That is 72% by our sum. [3]

Exhibit 2

The ERP sees the plan. It struggles to see the floor.

Difficulty getting ERP visibility into execution93%ERP cannot prevent execution failures (agree)72%Share of 150 senior leaders, $250M+ discrete manufacturers
Sources: LeanDNA and Wakefield Research, reported by MH&L News, April 2026 (93%); LeanDNA study results, 2026 (21% strongly plus 51% somewhat agree; the 72% is our sum; MH&L reports 73%). Vendor survey of larger firms than most of our readers.

Two cautions. LeanDNA sells an overlay for this problem, so it has a reason to find it. And "difficulty seeing execution" is not "distrust". No survey we found asks plant staff whether they trust the ERP's numbers. We infer trust from the spreadsheets beside the ERP.

Anthropic's launch note for Claude for Manufacturing cites a 2025 Manufacturing Leadership Council survey: 79% of manufacturers said they enter data manually. [4] A record built by hand, at the end of a shift, drifts in the ways hands drift.

Five defects, three tests

We planted fifteen defects in a synthetic plant: an ERP, a maintenance system, a shop-floor system, sensors and quality records, all invented. Five are the ordinary kind that make a report quietly wrong. [5] One synthetic plant and one grader show what the check catches. They do not show how common each defect is.

  1. Actuals booked at standard. When actuals are missing, a system can backfill them with the standard. The report still shows a number. It shows the plan, labeled as the result. In our run the data-consolidate skill flagged 135 of 420 job-cost rows as probably booked at standard. Test: pull last quarter's closed work orders with standard and actual cost side by side. Count the rows that match to the penny. A real job rarely lands exactly on standard. A cluster of exact matches is a posting rule, not a good month.
  2. Missing cost read as zero. A blank cost becomes $0, and margin on that part looks perfect.
  3. Silently stale export. One file ends a week early, and the trend dips with no error. Test: list the last record date of every export you rely on in one column. Look for the one that ends early. Every trend that joins it is wrong at the right-hand edge.
  4. Downtime that ends before it starts. Negative minutes shrink the downtime total. Test: sort the downtime log by duration and read the bottom. Negative minutes, zero-minute stops and events that end before they start each point to a clock or an entry screen, and each shrinks the total the plant manager sees.
  5. Sales quantity sign flipped. In our run, 40 of 40 order lines read negative, and totals inverted.

Exhibit 3

Five data defects behind an untrustworthy report

IDDefectWhat it does to a reportBlind run
D05Missing cost read as zeroA blank cost becomes $0. Margin on that part looks perfect.Caught: held unpriced
D09Silently stale exportOne file ends a week early. The trend dips, and nothing broke.Partly: dates noted, not called stale
D10Downtime ends before it startsNegative minutes shrink the downtime total.Caught: flagged, held out
D14Sales quantity sign flipped40 of 40 order lines read negative. Totals invert.Caught: sign convention flagged
D15Actuals booked at standardThe plan reads as the result. Bad jobs look average.Caught: 135 of 420 rows
Synthetic data. No real plant.
Source: Lehvel, blind run of Claude for Manufacturing, graded November 17, 2026. One synthetic plant designed by us, one grader, plugin pinned at commit fd30cee3.

None of these errors out. Each still produces a number, the report renders, and the meeting happens on a figure that was never true.

If a third of the actuals are really standards, a third of your margin report says the job went to plan. Your worst jobs look average, and estimators never learn which quotes were wrong. The next quote copies the same standard, and the loop closes without anyone touching it.

In our blind test, 135 of 420 job-cost rows carried the plan, not the result. Every margin report built on them says the job went to plan.

Lehvel blind run, synthetic plant, 2026

What Claude does with records you do not trust

Claude for Manufacturing ships a skill called data-consolidate. Anthropic's plugin source says it joins the plant's exports and connector data into one working dataset: ERP items, orders, work orders, routings and closed-job actuals; maintenance assets and work orders; and the shop-floor, sensor, quality and planning files. It keys on six identifiers: part number, work order, sales order, lot, asset, supplier. Every key that fails to match goes into one of eight mismatch classes. [6]

  • It proposes. It does not apply. For each mismatch class it writes a proposed fix and asks. "Apply them all" covers only the classes already shown, and rows a proposed fix would join stay unjoined until a person says yes. [6] In our blind run, 111 shop-floor production rows stayed unjoined until a person approved one key rule. [5]
  • It flags the source. It does not fix it. It builds a working dataset and a data quality report. It writes nothing back to the ERP. If 135 rows sit at standard, the ERP still says so tomorrow. A person in finance or production control has to correct the posting and fix whatever posts it.
  • It reports what it could not check. A date window that does not overlap comes first, because it explains most large mismatch counts. A blank is a blank, not a zero. [6]

Run the work in this order. First, identity: one answer for every part, asset, lot, supplier. In our blind test the plugin's weakest point was exactly this. It noted HS7731, HS 7731 and HS-7731 as format variants and never grouped them as one part. [5] We wrote that up in One part, three numbers. The fix is a crosswalk with an owner and an approval, not a cleanup sprint.

Second, standards: which costs are actuals, which are standards, and when a standard may stand in. Also settle which export is the source of truth for downtime, and when a production day ends. A plant can write those rules down in a week. Third, the skills. A morning report built on identity and standards is one people stop checking against a spreadsheet. Built on drift, it is one more number to argue with. The other order gives a fast, confident report on bad data, which is worse than a slow one. A slow report gets checked.

The skill runs on files alone, so it needs no connector to start. Use exports you already have: item master, work orders, job costs, routings, inventory, downtime, maintenance work orders and inspection results. A few months of history shows the patterns. It reads Oracle NetSuite, Autodesk Fusion and Microsoft 365 through native connectors, and Infor M3 read-only through a custom connector. [4] [6] Anything else comes in as a scheduled export or a custom connector, read-only first. It needs two named people: one in production control or IT who approves key rules, and one in finance who owns the standard-versus-actual rule. Without both, the proposals pile up and nothing joins. The data-consolidate track shows how we run it. Lehvel is independent. We are not an Anthropic or Infor partner.

The Monday test

You do not need Claude for this. Run the three tests above on your own exports. Start with defect 1, because it does the most quiet damage.

If all three come back clean, your ERP is in better shape than the common story says. If not, you know which defect to fix first, and Claude has a list to start from.

Ask finance three questions before you buy another dashboard. How many closed jobs carry actuals equal to standard to the penny? Which exports stopped updating without telling anyone? How many parts appear under more than one number across your ERP, your maintenance spares and your supplier catalog? If the answer is "we don't know", the project is not the problem. It finished. The problem is everything written to the ERP since.

Limits: no survey we found measures trust in ERP data directly. LeanDNA sells an ERP overlay and Panorama surveyed its own audience, so we cite both for direction. Claude finds and flags. Fixing the posting is a person's job and a process change.

Notes and sources

  1. Panorama Consulting Group, "The 2025 ERP Report," 2025. Consultancy survey, 172 respondents, median annual revenue $400.5 million. https://4439340.fs1.hubspotusercontent-na1.net/hubfs/4439340/Reports/ERP%20Report/2025-ERP-Report-Panorama-Consulting.pdf
  2. LeanDNA, study conducted by Wakefield Research, reported by MH&L News, "Supply Chain Problem Costing Manufacturers 10%+ of Revenue," April 15, 2026. Vendor survey of 150 senior leaders at discrete manufacturers with at least $250 million in revenue. https://www.mhlnews.com/global-supply-chain/news/55370483/supply-chain-problem-costing-manufacturers-10-of-revenue
  3. LeanDNA, "The Most Overlooked Discipline in Manufacturing," 2026 research results page, April 2026. Vendor survey, 150 senior leaders. The 72% is our sum of 21% strongly agree and 51% somewhat agree; MH&L's article reports 73%. https://info.leandna.com/2026-supply-chain-data-study-results
  4. Anthropic, "Introducing Claude for Manufacturing," November 12, 2026, citing a 2025 Manufacturing Leadership Council survey for the 79% figure. We did not open the MLC survey itself. https://claude.com/resources/articles/claude-for-manufacturing
  5. Lehvel, "Blind score: Claude for Manufacturing skills, as shipped, on a synthetic plant," graded November 17, 2026. Synthetic data, one grader, plugin pinned at commit fd30cee3. Public summary: https://lehvel.com/essays/we-ran-claude-for-manufacturing-blind
  6. Anthropic, claude-for-manufacturing plugin source, data-consolidate skill and its mismatch-class reference, Apache-2.0, November 2026. https://github.com/anthropics/claude-plugins-official/tree/main/plugins/claude-for-manufacturing

Get Upstream

One note a week: one job we took off an owner's plate, and what came of it.

Posts by Jason Murphy reach 17,000+ followers across our channels. The weekly email is called Upstream.

Weekly. Unsubscribe anytime. Privacy

Talk to Lehvel about your plant.

Forty minutes about your systems and which skills would run first. Pick a time below.

You'll talk with Jason Murphy, founder.He takes the first call and leads every engagement.Bring your IT lead.

  • About 40 minutes
  • Phone or video

Times in Eastern (ET).

Choose a day and time

Checking the calendar.

We use your details to coordinate this call. No payment information is needed.

Rather call or text?Call 888-846-7772Text us

Check your plant's systems against the 17 skills.

Book the Diagnostic, $2,250, credited to the Rollout when you're ready.

BackAll of Essays