Labs
Labs / Experiments · Updated 2026-11-17
One part, three numbers: what Claude for Manufacturing saw, and missed, in a blind test
One seal kit sat under HW-5521, SP-PB1-0087 and MHD-HS7731. The plugin scored 13.5 of 15 on our synthetic plant, and all three identity fixes still waited on a person.
See the Data consolidation track →
The press brake is down with a blown cylinder seal. Maintenance looks up spare SP-PB1-0087 and sees stock. Purchasing knows the same kit as HW-5521. The supplier lists it as MHD-HS7731. Three numbers, one box of seals, and no record that joins them.
We built that case into a synthetic plant to test Claude for Manufacturing blind. No real company, no real data. It scored 13.5 on a 15-point answer key, and the identity defects still waited on a person.
Three systems, three numbers, no thread
Each system's own number is fine inside that system. The ERP buys HW-5521. The CMMS issues SP-PB1-0087 to a work order. The supplier ships MHD-HS7731. The only thread is the manufacturer's number, and each system typed it differently.
Exhibit 2
One seal kit across three systems
Synthetic data. No real plant.The plugin's data-consolidate skill has a normalization ladder: trim, case, punctuation, leading zeros, revision suffix. [3] It saw that HS7731, HS 7731 and HS-7731 differ only in punctuation. It did not declare the three records one part. The wear plate has no manufacturer number at all. Only its description links its three records, and the skill does not match on descriptions. [2]
That is a reasonable place for software to stop. Similar descriptions are not proof of one part. A person who has held the part can say so in a second.
13.5 of 15, and none of the identity fixes ran without a person
Anthropic released Claude for Manufacturing on November 12, 2026: a plugin with 17 skills and four connectors. [1] We ran six skills against a synthetic plant: an ERP, a maintenance system (CMMS), a shop-floor system (MES), sensors, quality records and two customer inquiries, across 21 exported files. [2]
We planted 15 defects and wrote the answer key first. A separate runner followed the plugin's written skills literally and never saw the key. The method is in our field note on the blind run. The plugin scored 13.5 on the 15-point answer key: twelve caught, three partly caught, none missed. [2]
Read that score with its limits beside it. One synthetic plant, designed by us. One grader, with a hand check. Three of the 15 defects were about identity, which tilts the test toward finding this weakness. The runner did the helper-script steps by hand, and we ran 6 of the 17 skills. [2]
Exhibit 1
The three identity defects: planted against caught
| ID | Planted | What the plugin did | Score | Still waiting on |
|---|---|---|---|---|
| D01 | The same part under three numbers across ERP, CMMS spares and the supplier catalog. Three parts planted this way. | Noted format variants (HS7731, HS 7731, HS-7731; KB-455-96T and KB45596T). Never grouped the three records as one part. Missed the wear plate. | Partly | A crosswalk |
| D02 | The CNC saw is CNCSAW-A in the MES and sensor data, SAW-CNC-01 in the CMMS. | Flagged the orphan. Bridged the two names in the breakdown diagnosis, marked pending confirmation. | Caught | A person to confirm |
| D08 | MES part numbers drop the prefix: 4471B for AF-4471-B. | Proposed the fix. Held all 111 MES production rows unjoined until a person approves the rule. | Caught | A person to approve |
Exhibit 3
Blind score by defect type
Synthetic data. No real plant.Claude for Manufacturing scored 13.5 of 15 in our blind test. All three identity problems still waited on a person.
Lehvel blind run, synthetic plant, 2026Two and a half of three looks kind. The last column of Exhibit 1 says otherwise: none of the three resolved without a person. That is by design. It is also costly. The 111 held MES rows meant the morning report could not tie 811 pieces of production to their ERP part. The data-consolidate report listed 11 spellings and the rows it was holding. [2] Honest, and still a morning report missing a chunk of the plant's output.
Eight ways a key fails to match
The quote, the breakdown and the NCR all join on a part or an asset. The quote prices from closed work orders. The breakdown reads an asset's maintenance history. The NCR traces a defect to a lot and a supplier. A broken key breaks all three.
The data-consolidate skill sorts each failed match into one of eight classes. [3] Run them as a checklist on your own exports, with or without Claude.
- Orphan record. A record points at a key that does not exist on the other side. Output booked against a work order the ERP has never heard of.
- Format drift. Same key, different punctuation or spacing. HS7731 and HS-7731.
- Leading-zero loss. A spreadsheet ate the zeros. 004471 became 4471.
- Revision suffix mismatch. 4471-B on one side, 4471-B Rev 2 on the other. For routings the skill offers no automatic fix, because matching a routing to a drawing at another revision is exactly the mistake.
- Case and whitespace. A trailing space nobody can see.
- Genuine one-sided record. A part in the item master that has never been built. Usually nothing is wrong.
- Date-window mismatch. Two exports that cover different weeks. The skill checks this first, because it explains most large mismatch counts.
- Duplicate key. The same lot number on two different parts. The same work order twice with different quantities.
Classes 2, 3 and 5 are mechanical, and a rule fixes them once approved. Classes 1, 4 and 8 need a person who knows the plant. Class 6 needs a person to say "that is fine." The three numbers on the seal kit are worse than any one class. Each number is valid. Only a crosswalk says they are the same box.
Machines break the same way. The CNC saw is CNCSAW-A to the shop floor and the sensors, and SAW-CNC-01 to maintenance. The plugin bridged the two names and marked the bridge pending a person's confirmation. [2] Until a person confirms it, the saw's worst week, an 1,865-minute stoppage in our synthetic data, sits under a tag the maintenance system does not carry.
Panorama Consulting's 2025 ERP Report ranks data issues as the most common reason for schedule overruns, among projects that ran over. It gives a ranking, not a share, and it surveys the consultancy's own audience. [4]
A crosswalk, an owner, and a week to build it
The fix is one table that says which records are the same thing. It needs three parts.
Rules. One row per physical part, asset or supplier. A column for each system's number. The manufacturer number in one canonical spelling. A written rule for each accepted normalization, like "MES part numbers get the AF- prefix and a hyphen before the suffix."
An owner. One person approves every new row and rule, usually in production control or IT, with a maintenance lead for assets.
An approval trail. The plugin supports this half. data-consolidate saves each approved rule to the plant's profile, with both spellings, who said yes and the date. A rule nobody has read is never applied, even under "apply them all." [3]
Claude finds the candidate matches and drafts the rows. The person reads them and says yes or no. It needs only exports: the item master, CMMS assets and spares, the supplier catalog and a few months of MES production. No connector. [3]
- Day one. Pick the 50 parts with the most transactions, and every machine on the main line.
- Day two. Run data-consolidate on the exports. It groups spellings, flags orphans and drafts matches with the evidence for each.
- Day three. The part owner and the asset owner read the proposals and decide, row by row. Each approved rule gets a name and a date.
- Day four. Fix the sources that keep breaking. If the MES drops the prefix every time, change the export or the scanner label.
- Day five. Rerun the same exports and skills. Count the rows that join now and did not on Monday.
Track two numbers after that. The share of production rows that join to an ERP part with no proposal pending should climb to nearly all. The count of new spellings per week should fall toward zero. If it never falls, the crosswalk is absorbing an error that belongs at its source.
Lehvel is independent. We are not an Anthropic or Infor partner. The skill has its own page: the data-consolidate track.
Notes and sources
- Anthropic, "Introducing Claude for Manufacturing," November 12, 2026, citing a 2025 Manufacturing Leadership Council survey for the 79% figure. https://claude.com/resources/articles/claude-for-manufacturing
- Lehvel, "Blind score: Claude for Manufacturing skills, as shipped, on a synthetic plant," graded November 17, 2026. Synthetic data, one grader, plugin pinned at commit fd30cee3. Public summary: https://lehvel.com/essays/we-ran-claude-for-manufacturing-blind
- Anthropic, claude-for-manufacturing plugin source, data-consolidate skill, Apache-2.0, November 2026. https://github.com/anthropics/claude-plugins-official/tree/main/plugins/claude-for-manufacturing
- Panorama Consulting Group, "The 2025 ERP Report," 2025. Consultancy survey, 172 respondents. https://4439340.fs1.hubspotusercontent-na1.net/hubfs/4439340/Reports/ERP%20Report/2025-ERP-Report-Panorama-Consulting.pdf
What we asked and what we found
Every entry answers the same eight questions, in this order.
Question
Why it matters
State
What we built or tested
- A synthetic plant with an ERP, CMMS, MES, sensors and quality records in 21 exported files, and 15 planted defects. Three were about identity.
- A blind run of six plugin skills by a separate runner, pinned at commit fd30cee3, graded against a hidden answer key and checked by hand.
Evidence
- Blind score
- 13.5 of 15 (synthetic)
- Identity defects caught
- 2.5 of 3
- Identity defects resolved with no person
- 0 of 3
- MES rows held for one key rule
- 111
What we learned
- The plugin flags identity trouble and does not resolve it. That is the right behavior for software that must not guess.
- The data-consolidate skill sorts failed matches into eight classes. Run them as a checklist on your own exports.
- A crosswalk with rules, an owner and an approval trail is the fix. Claude drafts it; a person approves it.
Limitations
- One synthetic plant, designed by us, with 3 of 15 defects about identity.
- One grader. The plugin's helper scripts were not executed.
What changes next
Next in Labs
- Next: The supplier lot that came back: tracing a failed lot to every open order
20 of 20 failing readings came from one supplier lot. 0 of 138 on other lots failed. A closed corrective action had blamed the operator. Claude traced the lot, then stopped for a person to sign.
Experiments
Claude for Manufacturing: 17 skills, 4 connectors and where it stops
Check your plant's systems against the 17 skills.
Book the Diagnostic, $2,250, credited to the Rollout when you're ready.
Get Upstream
One note a week: one job we took off an owner's plate, and what came of it.
Posts by Jason Murphy reach 17,000+ followers across our channels. The weekly email is called Upstream.
Weekly. Unsubscribe anytime. Privacy