Three supplier quotes take a week. EA or BOX12?
The item master carries one gasket at $0.58 EA. The purchase orders carry it at $38.40 BOX12. We ran Anthropic's supplier-quote-request skill on a synthetic plant. It held every draft and missed the unit conflict.
See the Supplier quote request track →
The item master says $0.58 EA. The purchase orders say $38.40 BOX12.
Three quotes on one glazing gasket, and the plant's own records disagree on the unit. The item master carries the part at $0.58 EA. Both purchase orders carry it at $38.40 BOX12. No export says how many gaskets are in a box. Anthropic's supplier-quote-request skill did not catch it. Our runner did, by hand. [5]
We ran the skill on a synthetic plant, an invented architectural-metals manufacturer. All data is synthetic, and two of the three suppliers are our inventions. One run, one runner, no grader beyond us. The runner followed the skill file literally. The request: "Source GK-2210, the glazing gasket. Get quotes from our suppliers." [5]
Picture the buyer's Monday. Engineering wants three quotes on a glazing gasket because the incumbent's last two deliveries were late. The item master has no spec. The purchase orders list the gasket by the box, and the item master lists it by the piece. She emails three suppliers from three old threads. By Thursday one answers in dollars per foot, one in dollars per box with no box size, and one with a question. The next week goes to making three bids comparable.
Per its source, the skill assembles the technical package at the verified current revision, the demand picture, the quality clauses and the commercial terms. It takes candidates from the approved supplier list and mandates the shape bids come back in. It drafts one email per supplier for the buyer to send. It never sends, never awards, and never closes on a quiet supplier. Its source puts the point in one line: "The quality of the package determines the quality of the bids." [4]
Sourcing is slow because the buyer rebuilds every request by hand
The spec lives in engineering's files, if it exists. The demand lives in the ERP and the last price on a purchase order. The approved supplier list is a spreadsheet the quality manager keeps. Nobody has updated the quality clauses, a Word file, since the last customer visit. The buyer assembles all of it into an email, three times. Then the bids come back in three shapes, and she reshapes them.
Fictiv, a manufacturing marketplace, publishes the best buyer-side numbers we found. In its 2026 report, 81% of leaders said supplier sourcing and manufacturing are too time-consuming and costly. [1] In its 2025 report, 77% said a lack of resources severely limits their ability to manage supply chains, and 52% named supplier quality, reliability and compliance as significant challenges. [2] All are vendor surveys. The market is not helping either. The Institute for Supply Management's Supplier Deliveries Index registered 59 in September 2026, its tenth month in slowing territory, and the Prices Index registered 77.9, up 6.8 points from August. [3] Both are diffusion indexes that show direction, not an on-time rate or a price level. We found no credible on-time delivery rate for mid-market suppliers.
Exhibit 1
Sourcing pain, in buyers' own words
Sources: Fictiv, 11th State of Manufacturing and Supply Chain Report, February 2026; Fictiv, 2025 State of Manufacturing and Supply Chain Report. Vendor surveys. Notes 1 and 2.
81% of manufacturing leaders say supplier sourcing takes too long and costs too much.
Fictiv, State of Manufacturing and Supply Chain Report, 2026, vendor survey
Pass one: no approved list, one vendor, no invented alternates
The plant never gave the plugin an approved supplier list. The skill took candidates from the ERP's vendor records only and marked every one "not confirmed approved." There was one: the incumbent. The skill flagged it loudly as a single vendor and invented no alternates. [5]
A tool that makes up two suppliers to reach three quotes is worse than useless.
Pass two: three drafts, all held, seven gaps
We then played the plant and supplied a synthetic approved list: the incumbent plus two invented alternates, all approved for gaskets. The skill built the package and three drafts, one per supplier. [5]
All three drafts came back held. The reasons: no contact email on file, no response date in the package, and a drawing revision it could not verify. The two new suppliers sat on the approved list but not in vendor records. Nothing went anywhere. The buyer releases the package, then sends each draft from her own mailbox. [5]
The package listed seven things a complete request needs and it could not find. They were the drawing, gasket spec, quality clauses, commercial terms, forecast, first-article date and quantity breaks. [5] Each gap named where it should have come from. That list is the buyer's Monday, written down.
The skill mandates one bid format for every supplier.
Exhibit 2
The bid every supplier must return
Synthetic run. No real plant.
- Unit price at each quantity break, each on its own line. No blended rates.
- Tooling and setup priced separately, never folded into the unit price.
- Who owns the tooling at the end of the order.
- Lead time in two parts, first article and production, each from a named event.
- Minimum order quantity.
- Currency.
- How long the price holds.
- Exclusions and assumptions, listed.
- Unit of measure and pack quantity.Added by our runner, not by the skill. See below
Source: Lehvel run of supplier-quote-request on a synthetic plant, plugin pinned at commit fd30cee3, November 17, 2026. Items 1 to 8 follow the skill's mandated bid structure; item 9 is our runner's addition, recorded as such. Notes 4 and 5.
The miss: the skill has no unit-of-measure rule
Our synthetic item master carries the gasket in each, EA, at 58 cents. Both purchase orders carry it in boxes, BOX12, at $38.40 a box. No export states how many gaskets are in a box. [5]
Exhibit 3
One part, two units of measure
Synthetic data. No real plant.
| Record | Unit | Price | What it implies |
|---|---|---|---|
| Item master | EA | $0.58 | The standard the plant plans against |
| Purchase orders, two | BOX12 | $38.40 | No pack size on any record |
| If a box holds 12 | EA | $3.20 | 5.5 times the item master price |
Source: Lehvel run of supplier-quote-request on a synthetic plant, November 17, 2026 (planted problem D03). Synthetic data. Note 5.
Send three suppliers a request without settling that, and one quotes per piece, one per box of 12 and one per box of 50. The comparison fails before it starts. Every bid comparison then carries a hidden factor equal to the pack size.
The skill has no unit-of-measure rule and no stop for this. Our runner's own words: "The conflict was not caught by any rule in the skill; it surfaced only because computing the Step 3 usage total required reading the PO uom (BOX12) next to the item master's EA." [5] The runner flagged it by hand in three places, converted nothing, and added the unit line to the bid format. That is our runner doing the buyer's job, not the skill.
This is our runner's report on the skill as shipped, pinned at fd30cee3. A later version may differ. In our earlier blind run, a different skill, data-consolidate, caught the same EA against BOX12 conflict while profiling the exports. [6] The plugin can see it. The sourcing skill, run on its own, does not look.
After the bids come back, and what a plant needs first
Our run stopped at the send gate, because no supplier was contacted and no bids exist. The rest of the loop is described in the plugin's README, and we report it as Anthropic describes it, untested by us. [4] The skill keeps a tracker that chases quiet suppliers with drafted reminders. It reads each bid into one shape and lists what each bid left out. It compares the bids side by side at every quantity break, in code. It recommends and never awards. When the buyer decides, it records who decided and when, and the winning price flows into the customer quote as a sourced outside-processing line. [4]
What a real plant needs before this runs:
- An approved supplier list by commodity, in one place, with an owner.
- A spec or drawing at a released revision for every part you source.
- Your quality clauses and commercial terms, current.
- One unit of measure per part, with the pack size recorded wherever a supplier sells in packs. Add a unit check to the sourcing skill as a plant rule.
- A buyer who releases every package and sends every email. Nothing leaves on its own.
Lehvel is independent and not partnered with or endorsed by Anthropic.
How many units of measure does your top purchased part have across your item master, your purchase orders and your supplier's catalog? If more than one, write down the pack size today.
Check your systems against the 17 skills, or see what supplier-quote-request needs on the Claude for Manufacturing page. The supplier-quote-request track shows the package this run built. Related: the quote that takes five days, the same problem facing your customer. And the NCR that comes back, where a supplier-caused flag starts a sourcing request.
Notes and sources
- Fictiv, press release on its 11th annual State of Manufacturing and Supply Chain Report, February 23, 2026. Vendor survey of 300+ leaders. https://www.fictiv.com/articles/fictiv-releases-11th-annual-state-of-manufacturing-supply-chain-report
- Fictiv, 2025 State of Manufacturing and Supply Chain Report, with Dimensional Research. Vendor survey. https://www.fictiv.com/ebooks/2025-state-of-manufacturing-report
- Institute for Supply Management, Manufacturing PMI Report, September 2026, published October 2026. Diffusion indexes; above 50 means slower deliveries or higher prices. https://www.ismworld.org/globalassets/pub/research-and-surveys/rob/pmi/baby202609pmi.pdf
- Anthropic, claude-for-manufacturing plugin README and the supplier-quote-request skill file, v1.0.0, November 2026, Apache-2.0. https://github.com/anthropics/claude-plugins-official/tree/main/plugins/claude-for-manufacturing
- Lehvel, run record for supplier-quote-request on a synthetic plant, November 17, 2026. Synthetic data; plugin pinned at commit fd30cee3. Internal document; figures and the quoted line are from it.
- Lehvel, "We ran Claude for Manufacturing blind on a plant," November 17, 2026. Synthetic data. https://lehvel.com/essays/we-ran-claude-for-manufacturing-blind
What we asked and what we found
Every entry answers the same eight questions, in this order.
Question
Why it matters
State
What we built or tested
- A run of supplier-quote-request on Lehvel's synthetic plant, twice: as shipped with no approved supplier list, then with a synthetic list of three.
- Synthetic data only. Nothing was sent, awarded or contacted.
Evidence
- No approved list
- Candidates from ERP vendors only, all marked not confirmed approved. One vendor, flagged loudly. No alternates invented.
- Three drafts
- All held: no contact on file, no response date, drawing revision unverified.
- EA vs BOX12 (planted D03)
- Missed by the skill. Our runner flagged it by hand. The data-consolidate skill caught it in the earlier blind run.
What we learned
- The list of what a complete package could not find is the most useful page.
- The unit of measure is an identity problem, like part numbers and asset tags.
- Add a unit check as a plant rule before sourcing runs on its own.
Limitations
- Synthetic data, one run. Two suppliers were invented for the test.
- The finding is on the skill as shipped at fd30cee3.
- No credible mid-market on-time delivery rate exists.
What changes next
Next in Labs
- Next: We tried to claim our business in ChatGPT on day one. The trades can't get in yet.
OpenAI opened business profiles in ChatGPT today. Storefronts and online stores can claim one. The roofer, the plumber and the window installer are marked coming soon.
Field notes
Claude for Manufacturing: 17 skills, 4 connectors and where it stops
Check your plant's systems against the 17 skills.
Book the Diagnostic, $2,250, credited to the Rollout when you're ready.
Get Upstream
One note a week: one job we took off an owner's plate, and what came of it.
Posts by Jason Murphy reach 17,000+ followers across our channels. The weekly email is called Upstream.
Weekly. Unsubscribe anytime. Privacy