Tracks / T18 / Cross-cutting
At-risk and rush orders
An order at risk: stock by warehouse, an approved alternate, a transfer or an added shift. The planner approves each move.
Check your systems against the 17 skills
| Who uses it | Planner and customer service rep |
|---|---|
| The problem | A customer needs it in two days. The lead time is four weeks. I find out a sub-assembly is short when the order is already late. |
| What comes out | Today, on exports: a drafted reschedule or changeover move for each significant exception, for the planner to accept. With live ATP: stock by warehouse and options with their consequences, each waiting for a yes. |
| Day one, exports only | Yes. With ERP exports, daily-production-report already drafts a reschedule or changeover move for each significant exception, with consequences traced. It does not apply the move. |
| With a connector | Live ATP and CTP, and creating a distribution order, need write access to the ERP. The plugin's Infor connector looks records up. Infor's own plugin makes changes in Infor. Infor said in the webinar that access needs a Velocity Suite entitlement through your Infor account rep. |
| Who signs | Planner, each move; Customer service rep, each option |
What it is.
- Not one plugin skill. In Anthropic's webinar, Infor showed Claude working at-risk production orders. The cause was material or capacity: machines or labor.
- For a short sub-assembly in a multi-level BOM, Claude proposed an engineering-approved alternate, and the planner approved it. For a labor shortage, it proposed a temporary second shift, and the planner accepted.
- For a rush order, a 2-day need against a multi-week lead time, real-time ATP showed no stock at the original warehouse.
- Claude found stock in other warehouses and created a distribution order. It offered an alternate item and a reallocation from a lower-priority order. The rep reviewed each option.
Not a single plugin skill. Statements by Anthropic and Infor are attributed below. Plugin source.
A worked example.
A good customer needs parts Monday against a six-week lead time.
- Thursday afternoon, a customer's line is down. They need assemblies by Monday. The quoted lead time is six weeks.
- Infor showed this case in its own demonstration on November 17, 2026. Lehvel did not run it.
- What goes in: live stock by warehouse, open receipts, allocations to other orders, and the plant's written bump rules.
- What comes out: options. Move stock from another warehouse. Use an approved alternate item. Reallocate from a lower-priority order.
- Where a person signs: the customer service rep reviews each option. The planner approves each move. Nothing moves before that.
- A plant not on Infor needs two pieces of work. One is a read-only stock and load connector. The other is the bump rules as a plant skill.
- Lehvel has not built a live ATP connector for a plant yet. A nightly export is enough to start.
What goes in.
- A multi-level BOM with engineering-approved alternates
- On-hand stock by warehouse
- Open sales and production orders with priority
- Routing and capacity: machines and labor
What comes out.
Our blind run did not reach this skill. This is the output its SKILL.md describes. No example is invented.
The order, the need date and the lead time. ATP by warehouse, and CTP where capacity is the constraint. Options, each with its consequence: transfer stock, an approved alternate, a reallocation from a lower-priority order, an added shift. Who approves each option. No option is applied without them.
The first week.
- We list last month's late orders and the cause of each.
- We write down your engineering-approved alternates and your priority rules.
- We run the daily report's exception moves on those orders. The planner checks each move.
What it does not do.
- It does not change an order, a transfer or a shift without the planner's yes.
- It does not create a distribution order without write access to the ERP.
- Lehvel has not built a live ATP connector for a plant yet.
What Lehvel adds.
The plugin leaves this part to you. We do it.
- We write your engineering-approved alternates into data Claude can read, with the engineer who approved each one.
- If your ERP is not Infor, we build the read-only connector that answers ATP: stock by warehouse, open orders, priority.
- We write your plant's rush-order rules as a skill, and put the planner's yes in front of every write.
We describe Infor's demonstration as Infor showed it. Lehvel is not an Infor or Anthropic partner.
Who signs.
Claude drafts. A named person decides.
| Who | Where | What it protects |
|---|---|---|
| Planner | Each move | Approves the alternate sub-assembly, the extra shift or the reallocation. Nothing changes a record without that yes. |
| Customer service rep | Each option | Reviews each option before the customer hears it. |
What Anthropic and Infor have said.
Infor describes Claude as the main user experience over its ERP, with precision coming from BOM structure and ATP/CTP. One order spans systems: CRM for quoting, ERP for production, WMS for shipping.
With the Infor connector in Claude for Manufacturing, teams can look up records. With Infor's plugin, they can also make changes in Infor from Claude.
Three questions the Diagnostic asks.
- How many orders were late last month because a sub-assembly or a person was short?
- Are engineering-approved alternates written down where software can read them?
- Can your ERP show stock by warehouse in real time, and who can transfer it?
Pick the tracks that pay first.
The Diagnostic maps your systems to the 17 skills and picks the two or three tracks to run first. The fee is credited in full to the Rollout.
You'll talk with Jason Murphy, founder.He takes the first call and leads every engagement.Bring your IT lead.
- About 40 minutes
- Phone or video