Tracks / T07 / Maintenance / breakdown-to-next-report
Breakdown to next report
From a machine going down to its cause in tomorrow's production report.
Check your systems against the 17 skills
| Who uses it | Maintenance lead and plant manager |
|---|---|
| The problem | Maintenance knows why the line stopped. The morning meeting doesn't, so we argue about it again. |
| What comes out | Tomorrow's production report with the breakdown in it: the leading cause, its confidence, and whether a technician confirmed it. |
| Day one, exports only | Yes. Runs with no sensor data and no connector. |
| With a connector | A CMMS connector for assets, history and PM plans, with Limble as the worked example, plus a historian export. No CMMS connector ships. |
| Who signs | Technician, at Step 4 |
The job.
- Runs the chain from a machine going down to its diagnosis in tomorrow's production report.
- Reads the sensor window, the maintenance history with its close-out notes, technician photos and the manufacturer's manual together.
- Ranks likely causes with the cheapest test that tells them apart. Safety implications come before any diagnosis.
- Adds the diagnosis and its downtime to the next morning's downtime log and exceptions.
From the skill's own SKILL.md, breakdown-to-next-report, in Anthropic's public plugin source.
A worked example.
The next morning's report opens with the seized saw, its cause marked proposed.
- Synthetic plant, the morning after Saw A seized on October 22. The chain runs the diagnosis, then the next report.
- What comes out: a report whose safety block carries the breakdown, the leading cause and its confidence.
- The cause shows as proposed. A technician step shows as confirmed, pending or skipped, so the meeting sees which.
- The chain also drafts a PM change: a weekly vibration check, and investigate at 1.5 times the 2.1 baseline.
- The daily mean crossed 3.1 mm/s on October 19, three days before the stop. The hourly maximum crossed October 16.
- The draft swaps the template close-out for a bearing and blade check. The sibling saw gets the trend check.
- Where a person signs: the planner approves the PM change or not. The CMMS never changes on its own.
- The sensor data has no alarm limit. We read the past window and did not test live monitoring.
Source: Lab: The machine that stops every third Tuesday. Figures marked synthetic come from a plant we invented.
What goes in.
- What breakdown-diagnosis reads: work orders with close-out notes, sensor exports, photos and the manual
- The consolidated dataset the morning report runs on
What comes out: a run on a synthetic plant.
Real output from our blind run. A separate agent ran the skill as shipped on exports from a plant we invented. No real plant, no real customer. Excerpt, verbatim.
A safety-flagged breakdown diagnosis record is carried in: CNCSAW-A (CMMS SAW-CNC-01), stoppage 2026-10-22 06:40 to 2026-10-23 13:45, 1865 min. State: advisory (leading cause: front spindle bearing failure, confidence medium); technician_step pending, so the cause is proposed, not established. Follow your plant's lockout procedure before anyone works on the saw.
The first week.
- We match maintenance and production downtime codes, so both count the same minutes.
- Run the chain on your last breakdown and the morning report that followed it.
- We check each morning's report against the floor for the first weeks.
What it does not do.
- It does not write to a maintenance ticket.
- It does not report a proposed cause as established. The technician's step shows as confirmed, pending or skipped.
What Lehvel adds.
The plugin leaves this part to you. We do it.
- We build the CMMS connector, so the chain starts the moment a work order opens.
- We set the downtime codes, so maintenance and production count the same minutes.
- We run it on your plant and check the report against the floor for the first weeks.
Who signs.
Claude drafts. A named person decides.
| Who | Where | What it protects |
|---|---|---|
| Technician | Step 4 | The chain waits on a person working the machine. The record says whether that step happened: confirmed, pending or skipped. Nothing is written back to a ticket. |
Three questions the Diagnostic asks.
- How does a breakdown reach the morning meeting today?
- Do maintenance and production use the same downtime codes?
- Who confirms a cause before it goes in the report?
Pick the tracks that pay first.
The Diagnostic maps your systems to the 17 skills and picks the two or three tracks to run first. The fee is credited in full to the Rollout.
You'll talk with Jason Murphy, founder.He takes the first call and leads every engagement.Bring your IT lead.
- About 40 minutes
- Phone or video
Rather call or text?Call 888-846-7772Text us