Essays
EssaysPlant numbers
The slow quote, in numbers
Six numbers on quote speed. Every one comes from a company that sells quoting software, because no independent study exists. Here they are, with their limits.
By Jason MurphyPublished 2 min read

Every shop has heard that a slow quote loses the job. We went looking for the evidence. Every public number we found comes from a company that sells quoting software. We found no independent study of RFQ turnaround or win rate.
That does not make the numbers wrong. It means you should read them as direction, not proof. Here are the six we trust most, each with its source.
Exhibit 1
The slow quote, one sheet (all vendor data)
| Figure | What it measures | Source and limit |
|---|---|---|
| 67% | Part buyers who expect a quote in under 24 hours, up from 53% in 2019 | Paperless Parts, 2020 Part Buyer Survey, cited in 2022. Vendor survey. Sample not shown. [1] |
| 47% | Buyers who say speed of response affects which shop they choose | Paperless Parts, 2022 Custom Part Buyer Survey. Vendor survey of 600+ US manufacturing professionals. [2] |
| 94% | Buyers who tried at least one new vendor in the past year | Paperless Parts, 2022 survey. Vendor survey. [2] |
| Up to 2 hours | Time to build a quote for a single part | Modern Machine Shop, citing Paperless Parts research. Article date not captured. [3] |
| 2 weeks to 2 days | One job shop's average quote time, before and after quoting software | Paperless Parts case study. One vendor-chosen shop. What slow looks like, not a benchmark. [4] |
| 81% | Leaders who say supplier sourcing takes too long and costs too much, up from 73% | Fictiv, 11th State of Manufacturing and Supply Chain Report, February 2026. Vendor survey of 300+ leaders. [5] |
What the sheet says
Buyers expect speed. Two thirds of part buyers in the 2020 survey wanted a quote within a day. Nearly half in 2022 said speed shapes who they pick.
Buyers also move. In the 2022 survey, 94% tried at least one new vendor in a year. A first RFQ from a new buyer is a test, and the clock starts when it lands.
A quote takes real time. Up to two hours for one part, by Paperless Parts' research. One shop in a vendor case study took two weeks to send a quote before it changed its process.
The 81% shows the same wait from the other side. Fictiv's respondents are the buyers and sourcing leads. Most of them say sourcing takes too long.
What the sheet does not say
None of these numbers proves that a faster quote wins more work at your shop. The win-rate figures that circulate online could not be traced to a study, so we leave them out.
The quote-time numbers describe the vendors' own customers and prospects. A shop that never looked at quoting software is not in the sample.
Where the time goes
Our view is that the math in a quote takes minutes and the lookups take the days: the last price paid, the drawing revision, a supplier's lead time, a cost nobody entered. Quotes that take five days walks one quote through. In our blind run on a synthetic plant, Claude for Manufacturing's quoting skill checked the tolerance against what the shop holds, then stopped at a blank cost and drafted no price. See the rfq-to-quote track.
The cheapest independent number is your own. Time your next 20 RFQs from receipt to send, and note where each one waited.
Notes and sources
- Paperless Parts, "The 7 fatal mistakes of quoting, #3: responding too slowly," June 9, 2022, citing its 2020 Part Buyer Survey. https://www.paperlessparts.com/blog/the-7-fatal-mistakes-of-quoting-3-responding-too-slowly/
- Paperless Parts, "Industrial buyer survey reveals new implications for US manufacturers throughout the supply chain," December 19, 2022. https://www.paperlessparts.com/press/industrial-buyer-survey-reveals-new-implications-for-us-manufacturers-throughout-the-supply-chain/
- Modern Machine Shop, "When it comes to RFQ, response time is money," citing Paperless Parts research. https://mmsonline.com/articles/when-it-comes-to-rfq-response-time-is-money
- Paperless Parts, Hillside Custom case study. https://www.paperlessparts.com/case-studies/hillside-custom-reduces-quote-time-from-2-weeks-to-2-days-with-paperless-parts/
- Fictiv, "Fictiv releases 11th annual State of Manufacturing and Supply Chain report," February 23, 2026. https://www.fictiv.com/articles/fictiv-releases-11th-annual-state-of-manufacturing-supply-chain-report
Talk to Lehvel about your plant.
Forty minutes about your systems and which skills would run first. Pick a time below.
You'll talk with Jason Murphy, founder.He takes the first call and leads every engagement.Bring your IT lead.
- About 40 minutes
- Phone or video
Rather call or text?Call 888-846-7772Text us
Check your plant's systems against the 17 skills.
Book the Diagnostic, $2,250, credited to the Rollout when you're ready.