NCR write-up
The nonconformance report (NCR), cited to the requirement it violates, with every suspect part located.
Check your systems against the 17 skills
| Who uses it | Quality engineer |
|---|---|
| The problem | Writing the NCR takes longer than finding the defect. And I still have to dig to see if we fixed this exact thing last year. |
| What comes out | A draft NCR in your template: the finding, the cited requirement, the suspect scope, where each part is, and whether this happened before. |
| Day one, exports only | Yes. Runs on pasted findings, inspection exports and uploaded drawings. No connector. |
| With a connector | NetSuite or Infor M3 for shipments. Microsoft 365 for drawings, specs and the quality library. No QMS connector ships. |
| Who signs | Quality owner, before the NCR is final and before anything reaches a customer |
The job.
- Writes the NCR: what was found and measured, and the requirement it violates, cited to its document and locator.
- States how many parts are suspect, and why that scope and not a narrower one.
- Finds where every suspect part is now, including parts already at a customer.
- Searches prior NCRs and CAPAs while it writes, and says whether the earlier fix held.
- If suspect parts are at a customer, drafts the escape notification against the contract's clock.
- Never cites a requirement it cannot locate.
From the skill's own SKILL.md, ncr-writeup, in Anthropic's public plugin source.
A worked example.
Twenty failing readings, one lot, and a suspect scope of 94 pieces that is a floor.
- Synthetic plant. All 20 failing wall-thickness readings come from lot AES-26-0914. Zero of 138 readings on other lots fail.
- The skill writes the NCR against the requirement the parts violate, cited to a document and a page.
- It sets the suspect scope at a minimum of 94 finished pieces. That is a floor, not a total.
- Five places can hold suspect parts. Only finished goods could be checked: 16 pieces, no lot recorded, all held.
- The other four places read not checked, never zero. Extrusion from PO-4996 to PO-4999 is tagged and stopped.
- Two work orders failed with no NCR. Four of the lot's 11 were never inspected. Five NCRs fold into one.
- The prior corrective action, CAPA-2026-009, did not hold. The failures follow the lot, not the operator.
- Where a person signs: the quality owner confirms the finding and containment. The NCR stays a draft until then.
Source: Lab: Supplier lot trace. Figures marked synthetic come from a plant we invented.
What goes in.
- Inspection results and the finding
- Work orders, lots and on-hand inventory by location
- Shipments from the ERP
- Drawings, specs and the quality document library
- Your controlled NCR template
What comes out: a run on a synthetic plant.
Real output from our blind run. A separate agent ran the skill as shipped on exports from a plant we invented. No real plant, no real customer. Excerpt, verbatim.
Identification: ncr_ref to be assigned (not invented); proposes to consolidate NCR-2026-040 to 044 (all Open) and add two work orders that failed inspection but have no NCR: WO-100252 (2026-10-07) and WO-100255 (2026-10-09). Lot AES-26-0914. 1. What was found: wall thickness below the 0.115 in minimum: 20 of 21 readings on the lot failed; range 0.1067 to 0.1149 in, mean 0.1109 in. 2. Requirement: specs/spec_notes.md, SPEC-ALU-014, extrusion wall thickness, nominal 0.125 in, +/-0.010 in, minimum 0.115 in. Gage: not recorded in the export (calibration date unknown).
The first week.
- We load your controlled NCR template and your customers' templates.
- Run it on recent NCRs, from the same inspection exports.
- The quality engineer compares each draft with the NCR that was signed.
What it does not do.
- It does not finalize an NCR. The quality owner confirms it.
- It does not send the escape notification. A person sends it.
- It does not cite a requirement it cannot find in your documents.
What Lehvel adds.
The plugin leaves this part to you. We do it.
- We load your controlled NCR template and customer templates, so the NCR is yours, not a house style.
- We connect your QMS read-only, so prior NCRs and CAPAs are searchable while the NCR is written.
- We make lot and part numbers agree across the ERP, the MES and inspection records.
Who signs.
Claude drafts. A named person decides.
| Who | Where | What it protects |
|---|---|---|
| Quality owner | Before the NCR is final | Confirms the finding, the cited requirement, the suspect scope and the containment plan. |
| Quality owner | Before anything reaches a customer | The escape notification is drafted, shown and sent by a person. |
Three questions the Diagnostic asks.
- Where do NCRs live now: a QMS, a spreadsheet, or paper?
- Do customers require their own NCR or 8D format?
- Can you trace a lot from receipt to every part that used it?
Pick the tracks that pay first.
The Diagnostic maps your systems to the 17 skills and picks the two or three tracks to run first. The fee is credited in full to the Rollout.
You'll talk with Jason Murphy, founder.He takes the first call and leads every engagement.Bring your IT lead.
- About 40 minutes
- Phone or video
Rather call or text?Call 888-846-7772Text us
Check your systems against the 17 skills
Lehvel is an independent firm. We are not an Anthropic partner, and Anthropic has not certified us. Claude is a product of Anthropic. Anthropic's post · plugin source