Supplier escape to alternate source
From a defect traced to purchased material, through root cause, to an RFQ for an alternate source.
Check your systems against the 17 skills
| Who uses it | Buyer and quality engineer |
|---|---|
| The problem | The supplier's lot was bad. Quality is still arguing about it, and I need a second source before the line runs out. |
| What comes out | An NCR with containment, a supplier-caused flag with its own approval, a corrective action record, and a sourcing package for the buyer to release. |
| Day one, exports only | Yes. Runs on pasted findings, uploaded drawings and file exports. No connector. |
| With a connector | Microsoft 365 and NetSuite or Infor M3 where connected. |
| Who signs | Named owner, at Gate 1, after step 2; Buyer, at Gate 2, before step 4 sends |
The job.
- Runs the chain from an NCR traced to purchased material to an RFQ for an alternate source.
- Writes the NCR and its containment.
- Establishes the root cause against the supplier, not the process, and records the corrective action.
- Builds the sourcing package with a response format that makes the bids comparable.
From the skill's own SKILL.md, supplier-escape-to-alternate-source, in Anthropic's public plugin source.
A worked example.
A closed corrective action blamed the operator. One supplier lot was the cause.
- Synthetic plant. An inspector finds extrusion walls under the minimum. The first question is where else this material is.
- Lehvel ran the lot trace, the step before this skill, on invented data. It did not run this skill.
- What comes out of the trace: all 20 failing readings came from lot AES-26-0914. Zero of 138 readings on other lots failed.
- The lot joined four purchase orders, PO-4996 to PO-4999, and 11 work orders. At least 94 pieces are suspect.
- Where a person signs: a quality owner confirms the finding and the scope. The trace stops there.
- This skill picks up next and builds the alternate-source request. A buyer releases it. Nothing reaches a supplier before that.
- Read from its source, not run: the plant must supply the approved supplier list and the part revision.
Source: Lab: Supplier lot trace. Figures marked synthetic come from a plant we invented.
What goes in.
- Inspection results, lots and on-hand inventory by location
- Drawings and specs at the current revision
- The approved supplier list and vendor records
- Shipments, receipts and PO history from the ERP
What comes out.
Our blind run did not reach this skill. This is the output its SKILL.md describes. No example is invented.
An NCR with containment. A root cause established against the supplier, with a supplier-caused flag that carries its own approval state. A corrective action record. A sourcing package with a mandated response format, drafted for the buyer to release.
The first week.
- We name the owner of supplier-caused calls in your plant.
- Run the chain on your last supplier escape.
- Quality and purchasing check the drafts together.
What it does not do.
- It does not call the supplier at fault without the named owner.
- It does not send the sourcing package. The buyer releases it.
What Lehvel adds.
The plugin leaves this part to you. We do it.
- We connect quality and purchasing records, so the chain crosses departments without a hand-off.
- We name the owner for supplier-caused calls in your plant and wire the gate to that person.
- We load the approved supplier list, so the alternates start from vetted names.
Who signs.
Claude drafts. A named person decides.
| Who | Where | What it protects |
|---|---|---|
| Named owner | Gate 1, after step 2 | The supplier-caused call has a named owner before it acts. |
| Buyer | Gate 2, before step 4 sends | Nothing reaches a supplier unreleased. |
Three questions the Diagnostic asks.
- When a supplier causes a defect, who decides that, and how long does it take?
- Do you have a second qualified source for your top purchased parts?
- How do quality and purchasing hand off today?
Pick the tracks that pay first.
The Diagnostic maps your systems to the 17 skills and picks the two or three tracks to run first. The fee is credited in full to the Rollout.
You'll talk with Jason Murphy, founder.He takes the first call and leads every engagement.Bring your IT lead.
- About 40 minutes