Quote build
A make-to-order quote with every number traced to its source.
Check your systems against the 17 skills
| Who uses it | Estimator |
|---|---|
| The problem | I price from memory and an old spreadsheet. When the customer pushes back, I can't show where the number came from. |
| What comes out | The quote in your template, plus an internal cost sheet that shows the source of every number. |
| Day one, exports only | Yes. Runs on the intake form and pasted cost figures. No connector. |
| With a connector | NetSuite or Infor M3, or any ERP mapped into the consolidated dataset, for costs. Microsoft 365 for prior quotes. Autodesk Fusion for hours from CAM. |
| Who signs | Estimator, at Gate 3 and at Gate 4 |
The job.
- Builds the make-to-order quote from the intake form, comparable prior jobs and cost history. Every number cites where it came from.
- Prices material at the price paid on a named purchase order.
- Takes machine hours per operation from a labeled ladder: current routing, closed-job actuals, the confirmed design, then first principles. Setup and run stay apart.
- Re-amortizes setup at each quantity break. Keeps margin on its own line.
- Checks the promised date against shop load before it commits. When the customer counters, it revises in place and keeps what changed and why.
From the skill's own SKILL.md, quote-build, in Anthropic's public plugin source.
A worked example.
The material is priced at a paid PO, and the part with a blank cost stays unpriced.
- The same synthetic RFQ, at the pricing step. The estimator asks what the plant paid for 6061 bar last time.
- The skill prices material at the cost on a named PO. It does not use a standard cost.
- Each hour carries its source. Actuals that look like booked standards are flagged.
- Setup shows at every quantity break. Margin sits on its own line on the internal sheet.
- Part EX-2250 has a blank cost. The skill holds it unpriced and never reads a blank as zero.
- What comes out: the quote in your template, and an internal sheet that traces every number to its source.
- Written specs with no drawing produce a budgetary estimate, never a firm quote.
- Where a person signs: the estimator releases the quote. Lehvel has not timed a real plant's quotes.
Source: Essay: The quote that takes five days is losing to the one that takes one. Figures marked synthetic come from a plant we invented.
What goes in.
- The intake form from customer-inquiry-intake
- Standard cost, actual cost on closed work orders, and purchase prices
- Prior quotes and the plant's quote template
- A planning export for shop load
- Rates, set once in the plant profile
What comes out.
Our blind run did not reach this skill. This is the output its SKILL.md describes. No example is invented.
The quote in the plant's own template. An internal cost-basis sheet: material at a named PO price, hours per operation with each hour's basis, setup and run apart, setup re-amortized per quantity break, margin on its own line. A delivery date checked against shop load. On a counter, a revision in place that keeps what changed and why.
The first week.
- We put your rates in the plant profile and map the ERP's cost and routing exports.
- Rebuild quotes the estimator already sent, from the same inputs.
- The estimator compares each line with the quote that went out and marks the differences.
What it does not do.
- It does not release a quote. The estimator does, at Gate 4.
- It does not price hours from a design the estimator has not confirmed.
- It does not show margin to the customer. Margin stays on the internal sheet.
What Lehvel adds.
The plugin leaves this part to you. We do it.
- We map your ERP's cost and routing data, so the hours ladder starts from your closed jobs.
- We put your rates in the plant profile once, so nobody types them per quote.
- We connect the quoting or estimating tool you already use when it has no connector.
Who signs.
Claude drafts. A named person decides.
| Who | Where | What it protects |
|---|---|---|
| Estimator | Gate 3 | Confirms the design, the tolerance reading and the operation list. No hour from geometry gets a price without it. |
| Estimator | Gate 4 | Releases the quote. Every revision goes through the same gate. Margin stays on the internal sheet. |
Three questions the Diagnostic asks.
- Where do actual hours per job live: the ERP, a traveler, or one person's memory?
- Which quantity breaks do customers ask for most?
- How often does a promised date slip because the shop was already loaded?
Pick the tracks that pay first.
The Diagnostic maps your systems to the 17 skills and picks the two or three tracks to run first. The fee is credited in full to the Rollout.
You'll talk with Jason Murphy, founder.He takes the first call and leads every engagement.Bring your IT lead.
- About 40 minutes
- Phone or video
Rather call or text?Call 888-846-7772Text us
Check your systems against the 17 skills
Lehvel is an independent firm. We are not an Anthropic partner, and Anthropic has not certified us. Claude is a product of Anthropic. Anthropic's post · plugin source